Pipe is formed, welded, tested and coated here before it is packed for export. That is the reason we can answer a specification question with a production answer.
Hebei Shengzhun Import & Export Co., Ltd. · Industrial Zone, Hebei Province, China
01 / The company
Supplying pipe the way a buyer reads a specification
Hebei Shengzhun supplies spiral welded steel pipe, anti-corrosion coated pipe, pre-insulated pipe, elbows and flanges, custom fabrication and pipeline project materials to distributors and project buyers worldwide. Production, coating and export logistics are coordinated from one industrial base in Hebei, China.
Orders usually start with a schedule: a diameter, a wall thickness, a steel grade, a standard and a coating condition. The export desk checks that schedule against the mill before a price is issued, so the offer and the mill order describe the same pipe.
For distributors, the same approach applies to mixed shipments: pipe, coated pipe and fabricated lengths can be consolidated in one load, with documents prepared for the destination market.
Production base
Hebei, China
Forming, welding, testing and coating in one yard.
Export focus
Distributors
Supplying trading companies and project buyers.
Standards
API 5L · GB/T 9711
ISO 3183 also quoted for line pipe orders.
Loading
Container & bulk
Packing and documents prepared per destination.
02 / Production
Six stages between the coil and the container

01
Coil preparation
Incoming coils are checked against the mill certificate, then uncoiled, leveled and edge-milled before forming.

02
Forming and welding
Strip is formed into a helix and closed with a double-sided submerged arc weld tracked along the full length.

03
Sizing and end facing
Pipe is sized, straightened and end-faced, with the bevel prepared to the angle agreed for field welding.

04
Hydrostatic testing
Each pipe is pressure tested and dimensionally checked before it is released to the coating line or the yard.

05
Coating
3PE, FBE or cement lining is applied according to the service condition, with cut-back prepared for jointing.

06
Packing and loading
Pipes are bundled, end-protected and loaded to the packing plan, with documents issued against the order.
03 / Quality control
Every stage leaves a record
01
Raw material
Coil certificate checked against the ordered grade.
02
Forming & welding
Weld parameters recorded per shift.
03
Weld inspection
Visual check, with RT or UT arranged to project level.
04
Hydrostatic test
Hold pressure logged for each pipe.
05
Coating check
Thickness and holiday test on the finished coating.
06
Final release
Marking, documents and packing verified before loading.
04 / Certificates
Documents supplied with the order
Mill test certificates are issued per heat number. Management system certificates and third-party inspection reports are shared with buyers directly. Certificate copies are not published here until the company document set is confirmed.
Mill test certificate
Available on request
Management system certificate
Available on request
Third-party inspection report
Available on request
Coating test record
Available on request
05 / Export service
The part after production
Packing to plan
Bundles, end caps and marking arranged to the buyer's packing list or the site sequence.
Loading
Container or break bulk loading arranged from the yard according to diameter and length.
Documents
Mill certificates, packing list and shipping documents prepared against the destination.
Inspection support
Third-party inspection and buyer visits coordinated before shipment when required.
Want the factory profile and specification sheet?
Send your company details and the product line you buy. We will reply with the documents that match it.